170m2 Commercial Redesign and Floor Screed London

Principal Contractors Truewood joinery specialists in Shopfitting, architectural and bespoke joinery , Counter & Cabinet Production have hired Screed Works Ltd to screed their Nandos redevelopment in Greenwich, home of the legendary flame-grilled PERi-PERi chicken, located a short drive from the Royal Observatory and famous Cutty Sark location.

The programme being logistically challenging and time delicate, needed a quick turn around and the use of only the best materials.

Ardex A38 (3 hour Ultra Rapid Drying, Rapid Setting) done the job perfectly. Bonded with Ardex New ‘Green’ colour indicator Ardex A18, meant the screed was able to be walked on after only 3 hours, receiving its ceramic and natural stone tiles directly after only 4. Continuing trades were then able to move quickly and efficiently keeping the project on time, on budget.

Product used for this job

 Ardex A38

Time-critical projects require the very best in speed and performance.

Ardex A38 ultra-rapid drying.

Walkable after 3 hours and ready to lay tiles after just 4 hours, A38 is our go-to product for renovation projects where any delay would be a costly disaster for the project.

Ardex A38 is also moisture tolerant, so perfect for wet rooms, commercial kitchens and pools, where the environment dictates the very best performance.

“Screed Works Ltd recommended and used an excellent screeding product. Great job”

Ian Standard

Truewood Joinery & Shopfitters www.truewoodjoinery.co.uk


Do you have a similar project?

Call our friendly consultants to discuss how Screed Works can help with your next project.

Leave a Reply

Your email address will not be published. Required fields are marked *