Luxury Design and Build Developer Forbes Claymore chose Screed Works Ltd for the flooring package at this prestigious New Build in Kingston Upon Thames.
The required continuity and seamless transition between the design and construction meant the screed below had to be what is called in the industry an SR1 finish, which limits any deviation of the surface beneath, enabling floor finishes such as the upmarket Karndean tiles to be laid flawlessly, without the need for an otherwise costly levelling compound.
Share
Product used for this job
TARMAC Blue Circle General Purpose Cement offers exceptional performance. Often used on New Builds where follow on trades are flexible within the schedule.
• Consistent strength and performance.
• Compatible with admixtures such as ISOPOL SBR
“After speaking with Jennifer of Forbes Claymore it was immediately apparent her background in programme and cost management has dealt her a good hand. The team were efficient, organised and a pleasure to with.”
Russ Ayres
Screed Works Ltd
Do you have a similar project?
Call our friendly consultants to discuss how Screed Works can help with your next project.